Taxiway Charlie

Banks Construction completed this project as a subcontractor; it consisted of the complete replacement of approximately 4,300 linear feet of taxiway, including asphalt shoulders, demolition, storm drainage, and cement modification of soil.



Began: 01.2008
Completed: 03.2008

Taxiway Foxtrot

This project, $124,000 total cost, included milling and paving a section of runway at the Charleston Air Force Base for the complete resurfacing and rehabilitation of Taxiway Foxtrot, which Banks Construction Company as a subcontractor, finished on time and under budget. This project included:


Began: 04.2006
Completed: 09.2006

Taxiway Echo

Banks Construction Company was the prime contractor on this complicated $5M project involving a primary runway closure, around the clock construction and a very compressed schedule. It was completed on time and under budget. It included:


Began: 12.2003
Completed: 04.2005

Dorchester County Airport

The rehabilitation of Runway 6-24 at the Dorchester County (Summerville) airport consisted of pavement rehabilitation of the 3,700 foot long runway; including crack repair, soil sterilization, single surface treatment, bituminous pavement overlay and pavement marking. Banks Construction Company was the prime contractor on this $648,000 project and completed it under budget and ahead of schedule.


Began: 10.2006
Completed: 01.2007