Boeing

Boeing

As part of the construction of the new fabrication facility built to manufacture the 787 Dream-liner, this phase involved installing 108” RCP for storm drainage, as well as water and sewer relocation at various locations on the project site.  Phase II included excavating the existing pond to increase its capacity and creating a new pond at the corner of South Aviation and International Boulevard.

Asphalt Paving