• This is a 2018 Charleston County resurfacing contract administered through the Charleston County Transportation Committee.
  • There are a total of 73 roads on the contract throughout West Ashley, North Charleston and Mount Pleasant.
  • The project scope involves removing and replacing concrete curb & gutter, sidewalk, and pedestrian ramps, 4” Full Depth Patching, milling, and surface course paving.
  • Approximately 23,000 tons of Warm-Mix Asphalt is scheduled to be placed on the project.
  • Warm-Mix Asphalt allows for lower temperatures during production and placement, which results in lower emissions and fewer greenhouse gases. This makes Warm-Mix Asphalt more environmentally friendly without hindering product quality.

 

 

Join Our Team

Build Your Career at Banks

Our employees share our dedication to reliability and innovation and demonstrate the talent and drive to get the job done right and on time.

Learn More & Apply Online
PLANNING A PROJECT THAT REQUIRES

HEAVY CIVIL,
ASPHALT PAVING OR
MATERIALS & SERVICES?

Contact Us