• This was an SCDOT project that consisted of resurfacing 24 secondary roads throughout Colleton and Dorchester Counties.
  • The project scope involved removing and replacing concrete curb & gutter, sidewalk, and pedestrian ramps, 6” & 8” Full Depth Patching, milling, 2-ft shoulder widening, 12” Cement Modified Recycled Base, and intermediate & surface course paving.
  • A total of 26,000 tons of Hot-Mix Asphalt was placed on the project.

 

 

Join Our Team

Build Your Career at Banks

Our employees share our dedication to reliability and innovation and demonstrate the talent and drive to get the job done right and on time.

Learn More & Apply Online
PLANNING A PROJECT THAT REQUIRES

HEAVY CIVIL,
ASPHALT PAVING OR
MATERIALS & SERVICES?

Contact Us